Safecontrol were successful in securing the contract for the installation of a number of systems, for German machinery manufacturer Wirtgen.

Wirtgen whose core business is the production of machinery for road construction, maintenance and mineral processing, developed the Newark site to form state of the art UK head office.  The new £9.2 million site consolidates two existing sites and incorporates sales, service, workshop and storage facilities for the business. 

Our scope of works included structured cabling, Wi Fi, TV distribution and audio-visual systems.

Category 7a structured cabling was installed throughout the development with floor standing network cabinets located on each of the three floors and a satellite cabinet located within the warehouse.  The network cabinets are linked with OM4 fibre optic backbone cabling.  Additionally, wireless access points were installed throughout to provide site wide WiFi coverage.  An extensive IRS TV system was  installed with TV outlets located at various locations.  A comprehensive audio visual solution was installed in the conference/meeting rooms.